Skip to content
Services / Hospitality & Leisure

Waterpark Construction in Pune, Latur & Maharashtra

Family waterpark construction — slides and attractions, wave and activity pools, circulation and filtration plant, and the lifeguard-supported safety systems a public leisure facility needs.

01 / Overview

Overview

Waterpark construction is a hospitality-scale version of the aquatic work PBJ Infra has done since 2018. The difference from a residential pool is not the finish — it is the plant. A public waterpark has to move and treat far more water, far faster, than a private pool: filtration and circulation are sized to bather-load and turnover-rate norms, balance tanks and backwash recovery are designed in from the start, and every attraction pool has its own hydraulic circuit.

This service is for developers and operators planning a new family entertainment park, resort owners adding a wet-leisure zone, and municipal or trust-run leisure projects that need the pool shells, plant rooms, ride foundations and pool-surround works delivered as one coordinated contract rather than a stack of separate trades.

PBJ’s approach

PBJ Infra scales the filtration and structural discipline it applies to residential and lagoon pools up to multi-attraction public facilities. Pool shells, plant rooms and finishing are handled by the same in-house team, so the interfaces that usually cause delay — where a slide tower meets a landing pool, where a plant room meets a balance tank — are resolved on one set of drawings. Ride structures are built to the ride manufacturer’s structural specifications and integrated with PBJ’s own works.

Technical considerations

  • Turnover and filtration: attraction pools are designed around the water-turnover time appropriate to their depth and expected use, which drives pump and filter sizing.
  • Safety by design: depth transitions, non-slip surround finishes, lifeguard sightlines and clear depth signage are part of the layout, not added afterwards.
  • Water economy: backwash recovery, make-up water metering and pump control keep operating cost predictable.
  • Phasing: large parks are usually built in phases so an operator can open a first zone while later attractions are still under construction.

PBJ Infra’s Anandvan Water Park at Sarola Baddi, Ahilyanagar is a completed, operating example of this service at full scale — a 2.5-acre family water park for 400–500 visitors at a time, with a wave pool, a swimming pool, water slides and slide towers, a dedicated kids’ area, a rope adventure and a cycling area, built over three years. A second, Aero City Water Park, is under construction on 3 acres at Latur — also designed for 400–500 visitors at a time, with a main wave pool, slide towers and a kids’ play station — and is expected to complete in early 2027. This work draws on the same discipline as PBJ’s swimming pool construction and pool filtration systems, and pairs naturally with resort construction where the waterpark is one element of a larger destination.

Talk to PBJ about a waterpark project →

02 / Scope

What waterpark construction covers

01

Attraction pools & activity zones

Wave pools, activity and leisure pools, lazy rivers and children's splash zones — each with the shell geometry, depth transitions and non-slip finishes its use demands.

02

Slides & ride structures

Foundations, support towers and landing pools for body slides, tube slides and family rafting rides, coordinated with the ride manufacturer's structural drawings.

03

Circulation & filtration plant

Balance tanks, pump rooms, sand or glass-media filtration and dosing systems sized for public bather loads and turnover-rate norms, not residential volumes.

04

Water & energy systems

Make-up water, backwash recovery, heating and pump control so running costs stay predictable once the park is operating.

05

Safety & compliance infrastructure

Lifeguard sightlines, depth marking and signage, pool-surround drainage, plant-room access and the documentation an operating licence requires.

03 / Advantage

Why PBJ for waterpark construction

01

PBJ Infra built Anandvan Water Park — a 2.5-acre family water park at Sarola Baddi, Ahilyanagar, for 400–500 visitors at a time, with a wave pool, slide towers, a kids' zone and adventure and cycling areas — over three years; it has operated since 2023. A second, Aero City Water Park on 3 acres at Latur, is under construction.

02

The same in-house team handles pool shells, filtration plant and finishing — the three trades that most often clash on a waterpark site are coordinated under one contract.

03

Operating continuously since 2018, GST-registered (27BQRPJ7692F2Z4) and UDYAM-registered (UDYAM-MH-26-0101863), with permits and regulatory compliance handled directly.

04

5-year structural warranty and 2-year equipment warranty on every build.

04 / Process

How PBJ delivers waterpark construction

01

Consultation

Understand the intended attraction mix, expected daily footfall, plot size and phasing budget.

02

Design & planning

3D visualisation, hydraulic and filtration calculations for public bather loads, ride-structure coordination and a transparent, staged cost estimate.

03

Construction

Earthworks, pool shells, plant rooms, ride foundations and pool-surround works built and pressure-tested in sequence, with regular progress reviews.

04

Handover

Commissioning of filtration and dosing, water-balance sign-off, an operations and maintenance walkthrough for park staff, and warranty documentation.

05 / Common questions

FAQ

Depth transitions, non-slip surround finishes, lifeguard sightlines and clear depth signage are built into the layout from the design stage, not added afterwards. PBJ also plans pool-surround drainage, plant-room access and the documentation an operating licence requires as part of the same build.

Yes — the process includes 3D visualization and detailed planning before construction, so design and build stay with one team.

Yes — PBJ Infra handles necessary permits, approvals and regulatory compliance, and is well-versed in local building codes.

A 5-year warranty on structural work and a 2-year warranty on equipment, covering defects in materials or workmanship under normal usage conditions.

Cost depends on scope, size and finish level. PBJ doesn't publish fixed pricing — the project planner starts a consultation where a detailed, project-specific quote is prepared.

Start a project

Planning a waterpark construction project in Pune, Latur or elsewhere in Maharashtra?

WhatsApp Get Quote