Full-shell tiling
The entire pool interior tiled in ceramic, porcelain or glass mosaic — the most durable and colour-stable pool finish.
The finishing stage of a pool build — ceramic, porcelain, glass mosaic and natural-stone tiling for the shell, waterline and surround, plus coping and deck finishes, executed by PBJ's in-house team.
The tile is the part of a pool people actually touch and look at every day, and it is also the part that most exposes shortcuts in everything underneath it. Tiles laid on a substrate that was not prepared, or over waterproofing that was an afterthought, lift and craze within a few seasons. Because PBJ Infra’s own team builds the shell and then tiles it, the substrate is flat and sound, the waterproofing and the tile adhesive are chosen to work together, and the setting-out for mosaics around steps, benches and infinity edges is planned from the 3D model.
This service covers the finishing stage of a PBJ pool build, and tiling or re-tiling work on existing pools where the shell is sound.
Tiling happens after the structural shell and filtration are complete and the pool has held water. The substrate is checked and prepared, waterproofing is confirmed, and the tile is laid to a setting-out plan rather than started from a corner and adjusted at the end. Glass mosaic — the finish that best follows curves — gets particular attention on infinity edges, steps and lagoon shapes.
Tiling is the finishing layer on PBJ Infra’s swimming pool construction and lagoon pool construction, and works with the pool filtration installed earlier in the same build. The mosaic-tiled pools at Takawe Resort and AK Gemak Resort show the finish in practice.
The entire pool interior tiled in ceramic, porcelain or glass mosaic — the most durable and colour-stable pool finish.
A tiled waterline band and feature detailing over a plaster or aggregate interior, where a fully tiled shell is not required.
Small-format glass mosaic for deep, reflective colour and for tiling the curves of infinity edges, steps and lagoon forms.
Stone tiling and cladding for surrounds, walls and raised spa edges, selected for wet-area slip resistance.
Pool coping, non-slip deck tiling and the transition detail between water and surround.
Tiling is the final stage of PBJ Infra's own in-house pool build process — not a finish handed to a separate contractor after the shell is done.
Because the same team builds the shell and lays the tile, the substrate is prepared correctly for tiling and the waterproofing and tile bed work together.
Applied across PBJ's conventional, infinity and lagoon pools; covered by the 5-year structural warranty on the shell it sits on.
Tile material, format and colour chosen alongside the overall pool design and budget.
The tiling scheme — full shell, waterline, feature bands — finalised as part of the pool's 3D visualisation, with setting-out for mosaics on curved surfaces.
Laid after the structural shell and filtration are complete and the shell has been water-tested, on a correctly prepared and waterproofed substrate.
Final finish inspection at project handover, with grout and sealant cure guidance.
A standard residential swimming pool typically takes 4–8 weeks, depending on design complexity, size and weather conditions. A detailed timeline is provided during consultation.
Yes — the process includes 3D visualization and detailed planning before construction, so design and build stay with one team.
A 5-year warranty on structural work and a 2-year warranty on equipment, covering defects in materials or workmanship under normal usage conditions.