AK Gemak Resort
PBJ Infra developed the swimming pool, recreational facilities and landscaping at AK Gemak Resort in Kolhapur, completed in 2023 in about six months. The mosaic-tiled pool is built around a raised garden island reached by bridge walkways, and includes an in-pool basketball facility so it serves play as well as swimming; landscaping and improvement works were carried out across selected areas of the resort.
Project
HAG
Location / Year
Kolhapur, Maharashtra · 2023
Resort Pool, Recreation & Landscaping
Kolhapur, Maharashtra
2023
Completed
01 / Project
From brief to built.
Project overview
At AK Gemak Resort in Kolhapur, PBJ Infra’s brief was to lift the resort’s leisure offer: a new swimming pool, recreational activities and landscape improvement across selected areas of the property. The work was completed in about six months and finished in 2023.
The centrepiece is a mosaic-tiled pool built around a raised garden island, reached by white bridge walkways on either side, with a poolside lounge deck for guests. It draws on the same pool tiling and finishing and pool filtration discipline PBJ applies across its aquatic work.
Client requirement
The resort wanted more than a place to swim: a pool that also works as an activity space for guests, and grounds that feel more welcoming around it — within a defined six-month timeline.
PBJ’s approach
The pool, the raised island at its centre and the bridge walkways were designed as one structure rather than an island retrofitted into a pool, so the waterline, the island’s edge and the bridge supports all sit on the same engineering. An in-pool basketball facility was built into the swimming area, turning part of the pool into an interactive play zone without taking over the lanes. Landscaping was then used to improve the spaces around the pool and across selected areas of the resort.
Construction / execution
Structural shell and waterproofing came first, then filtration and circulation, then the blue mosaic tile finish across the pool and island edges. The raised island, bridge walkways and in-pool basketball installation followed, with landscaping, improvement works and poolside seating completed alongside — the full scope in about six months.
Final result
A completed swimming pool with an in-pool basketball facility, a garden island and lounge deck, recreation areas and refreshed landscaping at AK Gemak Resort, Kolhapur, in guest use since 2023.
Project details
- Location: Kolhapur, Maharashtra
- Scope: swimming pool · in-pool basketball facility · raised garden island & bridge walkways · recreation & activity areas · resort landscaping and finishing
- Duration: approx. 6 months
- Completed: 2023
Build something similar
Planning a pool, recreation areas or landscaping for a hotel or resort? Talk to PBJ about a resort project →
02 / Gallery
Project gallery
PBJ Infra
4 photographs
Build something worth remembering.
Planning a project similar to AK Gemak Resort? Tell PBJ Infra what you have in mind.